Alliance to Save Energy Home
spacer Search spacer spacer
Top purle triangle  
Efficiency in Pictures
Alliance to Save Energy Home
Alliance to Save Energy Home
information for
bottom of audience nav
Newsletter Subscription
Sign up to receive Alliance email newsletters!
act now

Air Conditioning and Commissioning

Welcome to the office of Executive Vice President and Chief Operating Officer Brian Castelli!

Alliance Executive Vice President Brian Castelli

Here we discuss the HVAC system, the commissioning process, and insulation, all of which contribute to the efficiency of our space as well as to our LEED-CI application.

Siemens Building Technologies' Air Conditioning Controls

Additional items selected with the LEED process in mind include direct digital controls (DDC) for the heating and air conditioning system supplied and installed by Siemens Building Technologies. These controls vastly improve the operation and performance of the HVAC system.

name

Here an HVAC technician from Comfort Control Inc. tests for proper airflow from a vent, a process know as testing and balancing. This activity was part of the commissioning process.

name

Commissioning is the process of testing the installation of the equipment installed during the construction process to ensure that it functions the way it was intended to. This step was an important part of the LEED certification process. Here (left to right) Vestal Tutterow (Alliance) Gene Foley (Advanced Power Control, Inc.) and our commissioning agent Paul Tseng (Advanced Building Performance, Inc.) discuss the commissioning of the lighting system.

name

Although we were unable to modify the building envelope we did use insulation donated by Owens Corning to add soundproofing throughout the new space.

  • Bookmark this with Del.icio.us
  • Digg This
  • Share this on FriendFeed
  • Bookmark this with Newsvine
  • Bookmark this with Reddit
  • Stumble This
  • Technorati
  • Bookmark and Share

privacy statement | feedback | home